BridgeTower profile storage system

Published: 24 / 09 / 2025

The first project using a BridgeTower automated storage system with a capacity of 1365 tons, for Metaltech-Piasecki


Customer

Metaltech-Piasecki specializes in machining steel and manufacturing steel structures. At its plants in Ciechanów, Płońsk and Czosnów, it carries out large-scale projects, serving customers from many countries. Dynamic growth, a growing number of orders and an increasing share of short-run jobs led the company to reorganize its processes for storing and processing long goods such as tubes, profiles and flat bars.

Challenges

  • Production hall layout and material flow: the company’s continuous growth and the increasing number of orders required expanding the machine park. The available space quickly began to shrink, and transporting long goods over 6m long was becoming more and more complicated,
  • Corrosion: storing materials in unfavorable weather conditions (high humidity, exposure to rain and snow) caused corrosion on the metal surface. Because of this, the material had to be prepared before processing, which took time and generated additional costs,
  • Efficiency: to meet customer expectations and increase machine efficiency, the customer wanted material delivered to specific production cells as quickly as possible. Traditional storage on static racks or “in the open air” and transport by forklift became inefficient over time.

Solution delivered

After analyzing Metaltech-Piasecki‘s development plans and challenges, a BridgeTower bridge-type storage system for tubes, bars and profiles was designed.

The system consists of 18 storage columns, a stacker crane and 4 loading and unloading stations that feed raw material directly to the saws and the tube laser cutter, with a total storage capacity of 1365 tons of raw material.

One of the loading and unloading stations, working inside the production hall, deserves special attention. Because of the track length of as much as 100 m, it was decided to equip it with battery power and special safety scanners that allow it to move at speeds of up to 0.6 m/s. Besides transporting standard materials up to 7 m long, the station is equipped with a frame for oversized materials, which allows it to carry materials up to 12 m long.

With further growth in mind, the system will allow a station serving another machine to be installed in the future.

The whole system will be integrated with ERP and APS systems thanks to our own Smart WMS Advanced software.

Results

  • Forklift transport of long goods reduced to zero in the production hall.
  • Material delivery time to the production machines shortened to 4 min on average, and to 2 min 45 s in the shortest cycles.
  • Storage of 1365 tons of material on an area of 280 m2.

Technical data

ParameterValue
System height17 800 [mm]
Shelf length/width7 300 / 650 [mm]
Shelf load capacity3 000 [kg]
Number of shelf locations in the rack455 [pcs]
Total load capacity1 365 000 [kg]
System length/width26 800 / 10 100 [mm]

 

Media