Sheet metal storage and laser automation with SmartFlow System

Published: 22 / 11 / 2026

The second stage of automation at Metaltech-Piasecki: a sheet metal storage system with a load capacity of over 2,000 tons, connected to two Bystronic laser cutters and a parts sorting area.


Customer

Metaltech-Piasecki processes steel and manufactures steel structures at its plants in Ciechanów, Płońsk and Czosnów for customers from many countries and many industries. Orders keep growing while batches keep getting shorter: a single sheet yields parts for different orders for different customers.

In the first stage, we built a BridgeTower long goods storage system at Metaltech. This post covers the second stage: sheet metal.

Challenges

  • Sheets were kept on racks in the roofed part of the hall, and every new product line added more racks.
  • Sheets were placed on the laser table with an overhead crane, and parts were sorted at the machine.
  • With short runs, most of the time went into everything that happens around cutting: delivering material, loading and sorting.
  • The automation had to work with the systems already running at the plant: the Microsoft Dynamics AX 2012 ERP and SigmaNEST, which continues to handle machines outside the system, including plasma cutters.
  • The customer wanted a system that would not lock the material flow into a single scenario, because processes at the plant will change over the years the machine is in operation.

Solution delivered

At the heart of the system is a MultiTower storage system with a stacker crane: 692 shelves with a load capacity of 3 tons each, 2,076 tons of sheet metal in total, in formats up to 3000 x 1500 mm and thicknesses from 0.5 to 25 mm. The storage system was built in a new extension added to the existing hall. Material is received by three loading and unloading stations with weighing systems, and a depalletizer with a certified scale works next to one of them.

The stacker crane delivers a shelf to the MultiLoader working lane. There, suction cups pick up a single sheet, separate it from the package and place it on the table of one of the two Bystronic laser cutters. After cutting, the unloading system collects the sheet with the cut parts from the table and places it on an access point.

The access points determine the flexibility of the entire system. There are three of them, each with two levels and three stops: in the MultiLoader lane, in the safety zone and outside it. They are not permanently assigned to any laser cutter. The same access point brings sheets to the automation, takes cut parts away for sorting or receives material bypassing the storage system. Instead of a shelf, a removable steel pallet can be placed on it, which a forklift will take further if the parts are not supposed to go back to the storage system.

Transport runs on queues. The storage system delivers shelves to the automation in advance, and there are enough access points for shelves to be prepared earlier and swapped without stopping the MultiLoader. The laser does not wait for sheet metal, and the automation does not wait for the storage system.

A cut sheet can go straight to sorting or return to the storage system on a shelf and wait there. As a result, the system cuts at night and at weekends, and the operator on the first shift calls up the parts for sorting. Sorting can take place at five locations at the same time.

Each laser cutter has its own safety zone, so servicing one machine does not stop the MultiLoader at the other. We also provided a separate zone for a third laser cutter, should the plant ever need one.

The whole system is managed by our Flower software. Flower Store keeps track of stock levels, Flower Pro plans and schedules the work of the lasers, and Flower Link connects the system to Dynamics AX 2012, to the APS production planning system, to SigmaNEST and to the Bystronic laser cutters themselves. The ERP remains the source of input, output and accounting data, while Flower holds the quantitative stock of material. A sorting operation was added to the process routings, because only after sorting is it known which parts are fit for further production.

“New processes have been mapped out that we previously did not even think could happen, such as automatic cutting, where the operator only supervises the process. Parts can be sent back to the storage system and sorted only after some time, not necessarily even by the operator,” says Michał Szcześniak, Director of Implementation and Organizational Development at Metaltech-Piasecki.

Results

  • Two automated laser cutters covered the production needs, although Metaltech had planned three cutting cells.
  • Nobody loads sheets onto the laser table with an overhead crane, and receiving a delivery into the storage system does not interrupt cutting.
  • The lasers cut at night and at weekends, and the operator only supervises the process.
  • Parts are sorted in a separate area, at five locations at once, away from working machines.
  • More than 2,000 tons of sheet metal fit into a single storage system covering an area of about 620 m².

Technical data

ParameterValue
System height9 300 mm
System length / width27 200 / 22 700 mm
Number of shelves692 pcs (630 with a usable height of 90 mm, 62 with a height of 200 mm)
Usable shelf dimensions3 100 x 1 600 mm
Shelf load capacity3 000 kg
Total load capacity2 076 000 kg
Sheet formatsup to 3 000 x 1 500 mm
Sheet thicknessfrom 0.5 to 25 mm
Materialsmild steel, stainless steel, galvanized sheet, aluminum
Maximum sheet weight for MultiLoader900 kg
Loading and unloading stations3 pcs, with weighing systems
Access points3 pcs, two-level, 3 stops each
Integrated laser cutters2 x Bystronic
SoftwareFlower Store, Flower Pro, Flower Link
IntegrationsMicrosoft Dynamics AX 2012 ERP, APS, SigmaNEST, Bystronic laser cutters