SmartFlow System with a stacker crane
Published: 27 / 05 / 2025
SmartFlow System serving two TRUMPF laser cutters with a MultiTower automated storage system at Netecs.
Customer
NETECS Spółka z o.o. specializes in designing and manufacturing radial fans used in dedusting systems in many industries, including explosion hazard zones. It supplies low, medium and high pressure fans for moving clean or dusty air. Due to the high volatility of the market environment and the need to keep increasing the efficiency of production processes, the company’s management decided to implement automation in sheet metal processing.
Challenges
Increasing the profitability of the cutting process
Before automation was implemented, metal sheets were stored on static racks and transported to the processing machines by forklift. Because of the number of machines involved in processing, organizing material deliveries was complicated and time-consuming. Until then, raw material was loaded with jib cranes, while cut parts were removed by hand. This way of carrying out orders proved costly and had a negative impact on production margins.
Reducing the role of forklifts in internal transport
The number of machines used in production meant that many operators had to be involved in driving forklifts. Achieving the right level of productivity required three-shift operation and often weekend work as well. Without automation, meeting the plan depended on staff availability and their effective and efficient work.
Optimizing High-Mix Low-Volume orders
In a High-Mix Low-Volume production model, where product changes and short runs are everyday reality, the ability to adapt quickly and a flexible approach are key. Performing many operations manually in such an environment is very difficult and limits the ability to carry out orders efficiently.
Solution delivered
A line for automated cutting of metal sheets with two TRUMPF laser cutters: one with automatic loading of raw material and unloading of cut parts, and the other served with raw material deliveries close to the laser work table.
The line consists of a MultiTower automated storage system with a stacker crane and a capacity of almost 750 tons of sheet metal, a transport system for single sheets to the cutter, a transport system for parts cut by the cutter and the BAUMALOG Planner Lite IT system. All elements of the system are integrated mechanically, by signals and through IT.
The CAD/CAM software, TruTops, is responsible for the technological part of the process, including nesting, while the Planner Lite software delivered by BAUMALOG enables efficient planning and management of the order queue.
To ensure an optimal flow of material, three press brakes were located right next to the automated storage system. In the bending process they use raw material or previously cut parts that returned to the BAUMALOG system after processing on the laser cutter.
Results
- Higher production efficiency and increased profitability of production.
- The role of forklifts in the sheet metal cutting area reduced to a minimum.
- Ready for efficient fulfillment of short-run and one-off (High-Mix Low-Volume) orders.
- Fewer operators involved in sheet metal cutting.
Technical data
| Parameter | Value |
|---|---|
| System height | 5 350 [mm] |
| Shelf length/width | 3 100 / 1 600 [mm] |
| Shelf load capacity | 3 000 [kg] |
| Number of shelf locations in the rack | 249 |
| Number of shelves | 130 [pcs] |
| Total load capacity | 747 000 [kg] |
| System length/width | 29 100 / 13 500 [mm] |