Sheet metal storage
Published: 28 / 09 / 2020
The French company Galvasteel decided to expand its machine park with a laser cutter and an automated rack.
Customer
The French company Galvasteel, which specializes in producing outdoor advertising elements, decided to expand its machine park with a laser cutter and an automated storage system in order to optimize its production process and increase work efficiency. We delivered the installation together with TCI Cutting from Spain.
Characteristics
The advanced, automatically operating sheet metal cutting setup consists of a TCI Cutting Smartline Fiber 4020 fiber laser cutter and a MonoTower® automated rack made by Baumalog, connected by a TCI Loader 3.0 handling system.
Stack storage in the MonoTower automated rack
The MonoTower® storage system contains one storage column and one transport column in which a lift moves. Its task is to move 15 movable shelves (usable dimensions 4,200 mm x 1,550 mm x 80 mm and a load capacity of 3,800 kg each) between the external loading and unloading station at the front of the MonoTower® rack and the storage column. The external loading and unloading station is equipped with a hydraulic lift that makes it possible to separate the metal sheets from the wooden pallet and store them in stacks directly on the shelf. Because of very strict requirements for sheet quality, the depalletizing system is equipped with a mechanism that prevents damage to the sheets while they are separated from the pallets. In addition, 5 selected shelves can carry sheets by forklift, without reloading, to press brakes among other machines.
Between the MonoTower automated rack and the Smartline Fiber 4020 laser cutter, the metal sheets are transported by the automatic TCI Loader 3.0 handling system equipped with a vacuum gripper.
Technical data
| Parameter | Value |
|---|---|
| Rack height | 6140 [mm] |
| Shelf length/width | 4200/1500 [mm] |
| Shelf load capacity | 3800 [kg] |
| Number of shelves | 15 |
| Total load capacity | 57 000 [kg] |
Media
The video shows the operation of the structure before all the rack shelves were installed: